Brick Paver Installation & Edging



Staging of material

The majority of paver projects will differ depending on access, website conditions, job size and of course, the weather condition. Cautious factor to consider ought to be taken to figure out the time to start the paver installation.

The supervisor or task manager must always have the products (sand/ pavers) dispersed around the task site for simple and effective installations. Paver pallets/bundles ought to be positioned in a manner not to disrupt the paver installation. The proper pallet/bundle placement can make the actual task installation easier and quicker by minimizing the overall labor of dealing with the material.

Brick paver patterns

Pavers can be put in several patterns depending on their shape. Each paver shape will normally have several different hatch patterns that are supplied by the manufacturer.

The laying pattern and shape of the paver is extremely important to the performance of the application. Specialists need to take into consideration the traffic weight loads on their paver jobs. 90 or 45 degree herringbone patterns are advised in all street and driveway applications, as these patterns will provide the optimum load assistance needed and will resist creeping from the turning of tires and braking or starting of car traffic. In a lot of applications around the world, it has been revealed that pavers laid in a herringbone pattern have actually performed adequately.

Pavers that are 60 mm (2 - 3/8 in) density appropriate for pedestrian applications. Pavers that are going to be used in business or commercial applications need to be 80 mm (3 - 1/8 in) in thickness.

Reference/starting point for brick paver installation

There are a number of conditions that identify the beginning point of a paver task.

When starting to install pavers it is best to snap a real straight chalk line on the surface of the bed linen sand or pull a true straight string line above the surface of the bedding sand at the ended up elevation of the pavers This will assist as a guide for keeping straight joint lines and will also allow the installer to make modifications in the positioning of the pavers.

Structures and concrete suppressing are generally not straight and ought to not be utilized for developing straight joint lines. The usage of string lines is essential to determine the true straightness of the edge. As the paver installation advances, the string lines will assist decrease the need for small trim pieces.

These will preserve a minimum joint width and enable the bed linen and jointing sand to get in in between each paver. Pavers with spacer bars are usually not laid in snug against each other since a string line will offer constant joint spacing.

Installation of brick pavers.

Among the most extensively utilized methods for the installation of pavers is hand installation of each paver. It is best to install a single row of pavers along one of the true straight lines that you have pulled or above the bedding sand. This will provide you a true and straight line off which to work. When this row is developed, you can continue to work outside into the field with the remainder of the pavers. Constantly make certain to occasionally examine your joint lines to make sure they are straight and real. If not, changes to the pavers can be made as you continue setting up. Pavers ought to be installed hand tight. The best technique is to put a paver versus another one and let it move down into the bed linen sand. Do not kick or tap the pavers into location as this can toss your lines out of real straightness.

When setting up pavers on a high grade, they need to be set up at the base of the grade going uphill. This will avoid the pavers from sneaking as they are being laid.

The best way for setting up pavers on big tasks is to install them mechanically. There are a couple products a professional ought to consider before installing pavers mechanically:

1.) Mechanical installers are just efficient in setting up pavers in specific patterns.

2.) The professional must make sure that the maker can production and bundling pavers in the preferred pattern on the pallets for easy mechanical installation.

3.) Contractors may come across a color blending situation coming off the packages of pavers Poor color mixing might result in a patchy looking installation. Most makers follow color blending on each bundle of pavers, but it is the contractor's duty to make sure appropriate blending in the field.

Cutting treatments for brick pavers.

Specialists usually have two ways of cutting pavers. Pavers are cut either by 1). A double bladed guillotine or by 2). A gas powered cut off saw or brick saw which is equipped with a diamond blade. The diamond blade cut-off saw or brick saw will supply a much cleaner and more accurate cut. The majority of brick saws will have a pipe attachment on them which will allow the operator to cut the pavers damp. When cutting pavers wet, it will help minimize dust and will prolong the diamond blades life. The operator of the brick saw should constantly cut the pavers away from the surface area of the paver field when cutting wet, due to the fact that the pavers will develop a slurry that will stain the paver surface. Pavers that are cut should not fit tight, enough spacing must be available for jointing sand.

The brick saw operator must always use the correct security that is required for running a saw, such as eye, ear, breathing and hand protection ).

Edging types

Edge restraints play a significant function in the overall success of an interlocking pavement installation Edging restraints remove lateral movement of the pavers and hold the pavers tightly together. Particularly at the outer border of the paver application, without an edging restraint, your job is guaranteed to stop working in time.

Normally produced edge restraints are the most commonly utilized by professionals. Made edging restraints can range from, plastic edging, steel and aluminum, lumbers or precast concrete and stone.

Edging installation.

This could result in the migration of the bed linen sand and eventual lateral movement of the pavers. If there is a possibility of losing bed linen sand between the pavers and the edge restraint, then geo textile material is advised. When a gap in between the pavers and the edging goes beyond 3/8" (10mm), then the space needs to be filled with cut pavers.

Compaction of brick pavers.

After installation, the pavers need to be compressed. The whole area that is to be compressed need to be swept clean of any foreign items and South Florida Pavers particles that can cause scuffing or scratching on the surface of the pavers.

It is important to have a compactor that can put in in between 3000lbs. And 5000 lbs. Of centrifugal compaction force. In addition, it is essential that the very first compaction takes place before any jointing sand has actually been applied to the pavers. This can cause a bridging problem and will not enable the joints to be entirely filled with jointing sand if jointing sand is applied to the pavers before compaction takes location. This can likewise prevent the pavers from being correctly set into the bed linen sand.

When compacting the pavers, it is suggested that you make a minimum of 2 passes in different directions across the pavers. This will permit the pavers to be effectively set in the bedding sand and will require the bed linen sand up into the joints from the bottom of the pavers.

The compaction of the pavers is extremely important to the last performance of the pavers. Failure to do proper compaction can lead to contortions and pavement failure over time.


Paver pallets/bundles ought to be put in a way not to interfere with the paver installation. One of the most extensively utilized methods for the installation of pavers is hand installation of each paver. The operator of the brick saw ought to constantly cut the pavers away from the surface area of the paver field when cutting damp, due to the reality that the pavers will create a slurry that will stain the paver surface. Edging restraints get rid of lateral motion of the pavers and hold the pavers securely together. When a space between the pavers and the edging exceeds 3/8" (10mm), then the space must be filled with cut pavers.